Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is mean by super structure?

Answer Posted / pradeep biswas

A super structure means the structure of the building which
includes beams, columns, slabs above ground level . Some
cases it can include outside brick work , chajja & lintels
also. IN short it can be the complete building structure
without internal finishes & foundation.

Is This Answer Correct ?    9 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the crank rod in slab

2380


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2628


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2056


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1998


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

1749


how we calculate the grade of the Bituminous materials.?????

2245


in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

3808


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2394


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2395


Why you are leaving present job?

2042


why is the column design?

2194


How is calculate the cube molt

2215


How to get MEP technical,instaaltion & testing data for interview?

2079


What is the general specifications of a bituminous pavement road?

1652


What is the maximum strength of cub compress strength in one cub testing

1834