Answer Posted / muhammad junaid
Super structure is is base on sub structure and which is above the plinth level
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is shuttering co efficient?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
Dear Sir What is the Contraction joint for base Slab
How cracks in concrete can be avoided?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
what is the list of building construction equipment & teir output?
Define What is diversion tunnel in a dam?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What is Architect-Prepared Contract?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
What is the use of water table & Kreb stone for drain
How many litres of water used for curing of 1000sqft of slav
Define What is aggregate?