what is westage % for steel, concrete,tiles,pains as per
indian staderd code?
Answers were Sorted based on User's Feedback
Answer / mohammed aijaz hussain
Wastage % of steel = 2.5% to 5%
Wastage % of concrete = 3%
Wastage % of tiles = 5%
Wastage % of paints = 2%
Is This Answer Correct ? | 90 Yes | 9 No |
Answer / baskaran
Is there any IS code refers the above wastages. please refer me the IS code.
Is This Answer Correct ? | 20 Yes | 4 No |
Answer / s jaikumar
Waste of steel is 2 to 4%
Waste of concrete is 2 to 5%
Waste of tiles and granties is 5 to 8%
Waste of paints 3 to 6%
It can reduced by the engineer who works in the project
Is This Answer Correct ? | 11 Yes | 6 No |
Answer / sri
Please Refer the IS Code, If they are available ..?
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ndd
Wastage depends on type / sizes of the concrete structural
members and how much efforts are giving towards reducing
the wastage of the construction materials at site.
Is This Answer Correct ? | 6 Yes | 8 No |
how to calulate coping material of boundry brick wall
How we decide the depth and size of footing? Give a example?
what is mean by compressive strength
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Please tell me the difference between nominal and clear cover. Thanks.
What are the types of test used to determine soil bearing capacity
What is mix design
What is portland cement
how to calculate Tile skirting
how to convert m 25 concrete to m 40?
is basic cost of the material includes tax?