what is westage % for steel, concrete,tiles,pains as per
indian staderd code?
Answers were Sorted based on User's Feedback
Answer / mohammed aijaz hussain
Wastage % of steel = 2.5% to 5%
Wastage % of concrete = 3%
Wastage % of tiles = 5%
Wastage % of paints = 2%
| Is This Answer Correct ? | 90 Yes | 9 No |
Answer / baskaran
Is there any IS code refers the above wastages. please refer me the IS code.
| Is This Answer Correct ? | 20 Yes | 4 No |
Answer / s jaikumar
Waste of steel is 2 to 4%
Waste of concrete is 2 to 5%
Waste of tiles and granties is 5 to 8%
Waste of paints 3 to 6%
It can reduced by the engineer who works in the project
| Is This Answer Correct ? | 11 Yes | 6 No |
Answer / sri
Please Refer the IS Code, If they are available ..?
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ndd
Wastage depends on type / sizes of the concrete structural
members and how much efforts are giving towards reducing
the wastage of the construction materials at site.
| Is This Answer Correct ? | 6 Yes | 8 No |
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What is the minimum compressive strength of a brick according to IS codes ?
30 Answers Arup, CCCL, GMR, L&T, Rachana Sansad, Theme Engineering, WAPDA Water and Power Development Authority,
it is a corrected question." make a list of engineering property(properties) of soil.
0 Answers AAI Airports Authority Of India, DLF,
reinforcement lapping for short pile and long pile
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
where i can get material costs on weekly basis
which has high coefficient of discharge venturimeter or orificemeter
how to calculate upthrust pressure of under ground water tank in wet soil?
why do you desire to change from your current position?
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
what is the problem not getting 7 days slab cycle in Mivan formwork? what is the output of mivan carpenter per day?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)