Answer Posted / rajesh
the portion of a building above the ground or above its
foundation.
Is This Answer Correct ? | 17 Yes | 7 No |
Post New Answer View All Answers
Where will be the maximum bending moment in a TEE Beam?
what is hydrostatic paradox?
What is the purpose of the gap in the road on this bridge?
What is an object snap mode?
what"s the sort of beams?
where i can get material costs on weekly basis
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
What is binding spacing of the rebars at lapping zones.
significance of specific surface area of particles?
Explain the difference between slab and beam?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
how to calculate load bearing column
how we can find sieve #4 is 4.75mm?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building