Answer Posted / praveen
it's the part of the structure, which rests above the
plinth level
| Is This Answer Correct ? | 17 Yes | 13 No |
Post New Answer View All Answers
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
how to calculate freeboard in under ground water tank and technical details
density of crush sand & crush stone or grit powder
Explain why concrete barriers have curved surface profiles?
which method is used in semi-rigid connection design??
How do we calculate absolute pressure?
for pretensioning which will yield first and same for post tensioning?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how much percent are used 20mm,10mm?
What are the benefits of rcc pipes over steel designed pipes?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
How many cement sand ballast in cc 1:4:8 40mm
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What is meant by engineering drawing?