What is ideal location for cube casting, RMC vehical at
Ground Floor and Slab casting at 40th Floor

Answers were Sorted based on User's Feedback



What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / santosh singh

at ground floor .....near vehicle

Is This Answer Correct ?    5 Yes 3 No

What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / balakrishna bedudoori

I think the ideal location for cube casting is near Slab
casting at 40th floor, because if we take concrete from RMC
vehicle at ground floor, free falling height of concrete
from the vehicle to the ground is generally more than 1.5m,
which can lead to seggregation of concrete, which is not
good for taking moulds.

Is This Answer Correct ?    5 Yes 4 No

What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / sumit

If Gap between TM chute and Ground floor more than 1.5
Mtr.so you not permitted cube casting on ground floor.
then the option is cube casting on 40th floor

Is This Answer Correct ?    3 Yes 2 No

What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / prasanna

Since atleast 6 cubes are taken for a batch of concrete, it
is advisable to take 3 each at both location, so that we get
clarity on workability of concrete.Average result of these 6
cubes will hold good.

Is This Answer Correct ?    1 Yes 0 No

What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / jyoti ranjan

actually it should be what type of conc. we r going to pour at a area,weather it is M35 and above then it must be in g floor but cube must be cast at pouring point.

Is This Answer Correct ?    0 Yes 0 No

What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / sobhanbabu

at the 40th floor only.pumping jurney takes nearly 10
minutes.during pumping heat generates.

Is This Answer Correct ?    1 Yes 2 No

What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floo..

Answer / sudhir shetty

Its at the ground floor because during pumping there will be
some loss of slurry etc which is calculated during designing
of structure after which required strength is calculated. If
its taken in 40th floor u will not get the perfect sampling.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.

0 Answers   Guru Nanak,


with out excell knowledge primavera is possible or not?

2 Answers  


calculate if the size of the beam is 300*500 then L for the top & bottom bar

2 Answers   ACPL,


What is quantity of cement and sand required for 2000sqft of tiling?

0 Answers   Infosys,


10x10 slab design

1 Answers  






different types of footing. and difference between footing and foundation

1 Answers  


9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement

8 Answers   L&T,


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

0 Answers   Jain Housing,


How much used for sand per square meter in 12mm Thickness

1 Answers  


what will do when 7days concrete has failed and structure has constructed?

6 Answers   Modi Builders,


discuss the precautions to be taken during the various steps of manufacturing of concrete

3 Answers  


Define What is unit weight of normal concrete?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)