What is ideal location for cube casting, RMC vehical at
Ground Floor and Slab casting at 40th Floor
Answer Posted / sumit
If Gap between TM chute and Ground floor more than 1.5
Mtr.so you not permitted cube casting on ground floor.
then the option is cube casting on 40th floor
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
though u r a civil engineer, y r u interested in tcs???
What is bmc stands for in bmc software?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Which are the Steel tests ?
Why the statue of liberty is made of copper?
what is the difference between np2 and np3 concrete mix
Why concrete barriers have curved surface profiles?
What is oneside mat. And explain
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
Define What is passive earth pressure ?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
what is mean by c32/40s concrete class
psc girder detail