Answer / mahesh
if it is a saturated sand then 1*1*.0120=.012cum*1920kg/cum=23kg of sand if it is a dry sand then 1*1*.0120=.012cum*1780kg/cum=21.36kg.
| Is This Answer Correct ? | 1 Yes | 1 No |
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the allowable limit of wastage of cement for RMC at plant operated manualy
What are your future hopes for this job?
extra how much quantity need to fill the actual excavated quantity.
Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com
How t find the quantity of materials required for construction of a wall of length 10x5x0.2
What is the size of your cube mould
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
15. List 3 of your weakest points as a worker?
Instrument used for determining PH of water
What is the maxi. percentage of steel in compression memeber of C/s area & what is minimum dia for compression member as per IS 456:2000?
How do I calculate the ground is resested for a 5 floor building?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)