What is quantity of cement and sand required for 2000sqft of
tiling?
No Answer is Posted For this Question
Be the First to Post Answer
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
0 Answers CDSIPL Centrodorstroy India Pvt Ltd,
convert area- 1 war = meter, 1 guntha = meter
how much repeitation for conventional and maivan formwork?
WHAT IS THE DIFFERENCE BETWEEN FACTOR OF SAFETY AND PARTIAL SAFETY FACTOR?
What is the differential length of steel reinforcement? What is the over lap length of steel in different grades of concrete?
how to estimate shuttering form work or how to take off material quantity???
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
how to calculate quantity of concrete volume of pile with bulb
how the load will be transfer from pile foundation to soil?
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity