what will do when 7days concrete has failed and structure has
constructed?
Answers were Sorted based on User's Feedback
Answer / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
Is This Answer Correct ? | 19 Yes | 1 No |
If 7 days result not getting,wait for 28 days.if 28 days
result not achived that perticular Quantity part breakdawn.
in any doubt with cube testing result we can also doing
core cutter test or rebound hammer test for at the 07 days
& 28 days sharp time period
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / suresh bariya
Generally we will wait for 28th day test,if 28 days test
result get failed then immidiate inform your structural
consultant,consultant will suggest the rebound hammer test
which is not a perfect solution, then do the core cutting
test it will give you the actual result of that strucutural
concrete, from this result you will know the actual
strength ,it will decide the jacketing will serve the
purpose or brecking is the final solution.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / amilineni s babu
we have to wait for 28 days strength if it is also less we
have to go for core cutting or rebound hammer tests for that
particular structure part.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / karnam seenu
,When a cube test conducted for a structural member fails, it is advisable to go immediately for a core cutting test and send the sample slab core to test the compressive strength. You need not wait for 14 days or 28 days.
Is This Answer Correct ? | 0 Yes | 0 No |
pile load testing procedure
Is there any alternate for plastering
what is meant by geosyntahtic system
7. Do you apply the skills and knowledge learnt at school in your work?
productivity of steel fitter per day
What is c.g.i sheet which used for roof??
why we used shahabad stone (ladi) in box type water proofing.what is the main roll of shahabad stone?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
how to calculate no of rings & weight of column including rings?
2 Answers HCC, Shivam Constructions,
Civil engineering related
What is the difference between opc cement to ferro cement
9*8m slab 1:2:4 ratio use for M20 mix how much cent is require it will become in cum but i want bags.