Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what will do when 7days concrete has failed and structure has
constructed?

Answers were Sorted based on User's Feedback



what will do when 7days concrete has failed and structure has constructed?..

Answer / modipraveen

Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.

Is This Answer Correct ?    19 Yes 1 No

what will do when 7days concrete has failed and structure has constructed?..

Answer / vimal prajapati

If 7 days result not getting,wait for 28 days.if 28 days
result not achived that perticular Quantity part breakdawn.

in any doubt with cube testing result we can also doing
core cutter test or rebound hammer test for at the 07 days
& 28 days sharp time period

Is This Answer Correct ?    4 Yes 1 No

what will do when 7days concrete has failed and structure has constructed?..

Answer / suresh bariya

Generally we will wait for 28th day test,if 28 days test
result get failed then immidiate inform your structural
consultant,consultant will suggest the rebound hammer test
which is not a perfect solution, then do the core cutting
test it will give you the actual result of that strucutural
concrete, from this result you will know the actual
strength ,it will decide the jacketing will serve the
purpose or brecking is the final solution.

Is This Answer Correct ?    2 Yes 0 No

what will do when 7days concrete has failed and structure has constructed?..

Answer / amilineni s babu

we have to wait for 28 days strength if it is also less we
have to go for core cutting or rebound hammer tests for that
particular structure part.

Is This Answer Correct ?    1 Yes 0 No

what will do when 7days concrete has failed and structure has constructed?..

Answer / karnam seenu

,When a cube test conducted for a structural member fails, it is advisable to go immediately for a core cutting test and send the sample slab core to test the compressive strength. You need not wait for 14 days or 28 days.

Is This Answer Correct ?    0 Yes 0 No

what will do when 7days concrete has failed and structure has constructed?..

Answer / suhana soni

i want to know.

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate testing date

0 Answers  


in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??

2 Answers  


about higyway engineering

1 Answers  


Define absolute co-ordinates?

0 Answers  


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

0 Answers  


what is the procedure of plastering..?

3 Answers  


how to cal 1:4 in brick masonary work cement and sand?

1 Answers  


In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?

0 Answers  


HOW MANY CEMENT BAGS ARE REQUIRED IN 1 CUBIC METER

11 Answers   Bharat Construction, CPWD, Ircon,


What should be the standard roof height like to be?

0 Answers  


What is the quantity of cement in mix m20 concrete?

0 Answers  


what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.

0 Answers   HSSB, JSW,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)