Answer / ravinder reddy
it wil be approx 25 to 30 kg depending upon the design approved.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sandip
for residential tower , commercial and also for industrial work = 45 to 55 kg / sq.mt for all type of R.C.C. work
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / eng m. noori
Per Sq.m area. if the building is any, 16Kg standard for
RCC slap.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ami.shah
The steel required will be around 40 - 50 kg/sqm of area for RCC Framed structure G + 3 FLOOR . This steel may vary depending upon the different seismic zones and type of structure.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajneesh chaturvedi
Figure depends upon the type of member existing in 1sqm, like beam column or slab.
generally the designer preffer 10mmdia @ 150mm c/c in light loading at mid span resulting 8.7kg/m (main+ distribution+ chair) in slab .
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nitin
1sqm=10.76sqft
For 1sqft=4.2kg
For 1sqm=4.2x 10.76=45.19kg
Means 1sqm=45kg/sqm
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bhuvan
it will depend upon the the plan and the diameter of steel.
if the diameter of steel is 25 then7 kg steel will be
used...
| Is This Answer Correct ? | 0 Yes | 1 No |
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is the percentage of steel in 1cu.m. RCC?
for 100 sqm cement concret (1:2:4) 4cm thick floor,the quantity of cement required is
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ?
Brick size ? & 1 square feet brick work for use brick
which grade of cement mostly used in construction and why..??
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
what is the difference between sill beam,Tie beam and plinth beam?
How to make a c++ program that converts any base to base 10?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)