Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much steel required for 1 sq.m area?

Answer Posted / ravinder reddy

it wil be approx 25 to 30 kg depending upon the design approved.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate canal slope curvature qty!

1896


How much cement and sand required for 9"brick wall per square metre

2874


The largest size of paper used in plotter to print the drawing made by Autocad .

1805


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1872


what mean By core Billing

2266


What is thumb rule for deep trench excavation

1747


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

2382


What is the best type of wood glue?

1126


Concrete cover for slab, column, beam and footing?

1040


what is m30 in concrete tiles

2315


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

5015


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

2347


What is the exception critarea of cube?

2479


how to calculate the length diamond shaped striupps in column

2673


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2052