Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How can we calculate quantity of slab, beam @ column ?
Beam should be calculated by deducting slab thickness or
slab should be calculate in to in ?

Answers were Sorted based on User's Feedback



How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab ..

Answer / sjtbehera

it is easy
length x breadth x height = qty.

if you calculate slab, if you adding beam thickness then
while you calculate beam you will deduct the qty. of beam
from qty. of slab

Is This Answer Correct ?    47 Yes 10 No

How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab ..

Answer / vivek

the beam thickness should not deduct the slab thick,

Is This Answer Correct ?    22 Yes 9 No

How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab ..

Answer / g.satyanarayana

Beam Qty = over All Depth of Beam x Length between Columns x
Width of Beam
Slab Qty = Length & Breadth to be considered from inner face
of Beam to inner face of beam and thickness of Slab

Column Qty = Over all height of Column including over all
beam Depth

Finally deduction of Steel Volume from the Total Qty So arrived.

Is This Answer Correct ?    16 Yes 9 No

How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab ..

Answer / gvb

just take all beams quantity, column quantity and slab quantity.(because slab thickness will be vary room to room like 41/2" to 5") so we have to calculate Beam, column and slab.

Is This Answer Correct ?    2 Yes 2 No

How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab ..

Answer / bharath m

Dear Mr.Jayesh,

Please Note:
1.Slab Concrete Quantity
Area of Slab including beam & Column covered area x Overall Depth of Slab.
2.Beam Concrete Quantity
Clear Span of BeamxBeam Widthx(Overall Depth of Beam-Overall depth of Slab)
3.Column Concrete Quantity
Lenght of ColumnxWidth of Columnx(Floor to Floor Height of Column-Overall Depth of Slab)

If still any queries pl. raise through Allinterview/to the Undersigned.

Thanks
Bharath
8438238335/9980644165
bharath.dce2006@gmail.com

Is This Answer Correct ?    4 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

0 Answers  


what are the differences between shear wall and column

4 Answers   BM, L&T, University of Gondar,


how can change 10mm dia @130c/c bar spacing to 8mm dia

5 Answers   TATA,


What are the methods of measurement? Describe it shortly

0 Answers   TATA,


what are the strenth of 1cum brick work

5 Answers  


how to calculate cement mortor for wet and dry mix for different ratios

1 Answers  


difference between tmt and tor steel

1 Answers   L&T,


What is the unit weight if concrete?.

28 Answers   Doshion, HCC, Jindal, KKR, RCL, Simplex, TCS,


how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?

1 Answers   LiveCon, Sobha Developers,


How do we say The LAP LENGHT is 50D to 60D ?????

3 Answers  


how many numbers of Precast concrete hollow blocks (400mmx200mmx200mm) can be installed by the one mason and two helper in one day.

2 Answers   Ircon,


first wt is reqd. for making a mix design of concrete & the procedure of determining the qty. of material used in concrete.

1 Answers   BirlaSoft,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)