Answer / abrar
depending upon the design and thickness of the steel rod
weight can be calculated
| Is This Answer Correct ? | 85 Yes | 11 No |
Answer / modipraveen
Hi Generally Per Cum. of concrete 75kg-110kg steel is
required... if you are asking for residential it may require
75 kg per CUM... if you are asking for commercial building
it may reach up-to 110kg per CUM... multiply it by thickness
of slab...
"this is only for slab"
| Is This Answer Correct ? | 56 Yes | 16 No |
Answer / sandy
how can be possible that 1 sq mtr slab area required 25 to 30 kg steel
in simple term residential building in slab having a thickness
110 to 125 mm provided Reinforcement generally #8@150 c/c for
distributer bar & #8@200 c/c spacing then calculation says that 5.530+1.825 => 7.355 Kg Per Sq mtr in slab
i also consider this figure may variously According to structure type
| Is This Answer Correct ? | 35 Yes | 9 No |
Answer / balamurugan r
As per thumb rule steel requirement per sqft for residential
buildings is 4-4.5Kg/Sqft. So just convert it into sqm. It
will around 40-48Kg/Sqm.
| Is This Answer Correct ? | 23 Yes | 8 No |
Answer / rahul
It depends upon the load on that area acting....if the load
is more than more steel will required....and if load is less
than less steel...
(if somebody has more problems for interview..please share
with me...mail me at rahuljainy245@gmail.com)
| Is This Answer Correct ? | 10 Yes | 5 No |
Answer / ranganatha.s.p
steel qty depends on type of design and structure. for slab
25kg-30kg
| Is This Answer Correct ? | 15 Yes | 10 No |
Answer / rashid khan,bptp ltd
for high rise building,the qnty of steel in superstructure
(incld column,Beam,slab)is about 48.00kg per SQM
| Is This Answer Correct ? | 8 Yes | 3 No |
how should we take soil sample for CBR test?
Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
What is the different type of slump test indications?
how do make a measuring box for 1 cubic metre of 1:2:4 concrete for 350kg
What is Time at Large?
what does '415' in FE415 stands for??
Explain what is the release of lien?
What is the basic difference between QA and QC
How can you achieve soil enforcement?
sometimes, in a column, reinforcement is provided equally on 2 sides and sometimes on 4 sides.what will be the difference in the method of designing?
what is a louer? and for which purpose it will be used.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)