why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?
Answer / deepak katyal
Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.
Is This Answer Correct ? | 20 Yes | 2 No |
unit weight of fine concrete??
wat happens to the foundation when only live & dead loads are considered( wind load is excluded) during the design of tall structures. options are: a)only settlement in the internal structure and not external structure b)only settlement in the external structure and not internal structure c)no differential settlement d)none of the above
4 Answers BBJ Construction, IOCL,
Special thing in designing a overhead reservoir ? which is different from an ordinary design
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
what is pile cap and why its used ??? why its provided in different shape
Which is default or standard size of tiles used in dado bathroom
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What do you mean by the word 'shear'?
what is a pretension and post tension with an example
What are the Design Mix proportion,and where they are used
how can we construct building without foundation providing only grade beam at ground level
How many types of rcc slab