Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.
| Is This Answer Correct ? | 20 Yes | 2 No |
What is a deep beam ? Explain ?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
What is most important to learn in Civil Engineers? AutoCadd,Staad, or Primavera...
can any give me bhel n other govt sec interview question
hai.... please any guide me were i can get interview questions& ans for Unigraphics
What is "Bending moment"? Demonstrate on theory not for formula.
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
how many express way in india
how many material required for brickbat water proofing of toilets.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)