for 100 sqm cement concret (1:2:4) 4cm thick floor,the
quantity of cement required is
Answers were Sorted based on User's Feedback
Answer / ketan shinde
100×.04=4cu.m of wet concret
To produced 1cu.m of concrte 1.54cu.m of dry concrte required
1.54×4=6.16cu.m
6.16/1+2+4=.88 cu.m of cement reqd.
.88×1440 (densityof cement)=1267.2 kg
Or
1267.2/50kg =25.34=26 bag of cement
Is This Answer Correct ? | 31 Yes | 9 No |
Answer / sanjay chandrawanshi
hi all correct answer is
100x.04=4
4x6.5 bags cement per m3= 26 bags
26x50 kg per bag = 1300 kg cement
Is This Answer Correct ? | 14 Yes | 5 No |
Answer / pankaj tiwari
100x.04=4m3
Nominal Mix 1:2:4 Ratio 1m3 Cement Consumption =312.68kg/m3
4m3 Concrete in Cement Required =1250.72kg
Is This Answer Correct ? | 0 Yes | 2 No |
whats is difference between anchorage length and development length
volume of one cement bag
4 Answers Grand Peaks, Omace, Swasudha Infra,
volume of 2 bulbs in pile of height 10' diameter 1'3''
The designs required to construct a building are ––
how to calculate the no. of brick (18'*9'-wall)
which is higher specific gravity or bulkdensity
what"s the purpose of dry lean concrete(DLC)and where it"ll be use it?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
How many bags required for 1cum grouting?
Tell me about Construction, Contraction and Expansion joints...
2 Answers Modi Builders, SMCC,
how many cement used in single story residential building per sqft
0 Answers Matrix PMC Consortium,
why we are using 190x90x90 mm of brick size?