For elevated service Reservoirs what will be the output of
each skilled carpenter and bar bender.
No Answer is Posted For this Question
Be the First to Post Answer
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
how to calculate result on Plate bearing test?
in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
difference between deep and shallow well?
why is M30 grade Concrete use for Foothing & Column M50
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
Which pavement is advisable in India?(Flexible or Rigid)
procedure for preliminary selection of size of column of 5 storey building
All aptitude question of Bechtel
how to caliculate required amount of cement and sand required for 1cu.m.
which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)