Answer / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / dinesh.rk
YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / saumik mallick
BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / vincent koil raj
bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure
| Is This Answer Correct ? | 2 Yes | 0 No |
How calculate the water for 1m3 concrete
which type of instrument included in plumbing work?name of instrument?
How to increse bearing capacity in soils (Stabilisation of soils)
how many kg sand is requried for plastring in 100 sqft?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
What is the size of a standard room?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
What should be the Slump(Min.)in cement in concrete in all grades of concrete?
Is there any difference in IS 456 and IRC 15?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)