what is BOQ? BOQ IS US IN ESTIMATE

Answers were Sorted based on User's Feedback



what is BOQ? BOQ IS US IN ESTIMATE..

Answer / nag

Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials

Is This Answer Correct ?    10 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / dinesh.rk

YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/

Is This Answer Correct ?    7 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / mahendra

BOQ is Bill of Quantity.

Is This Answer Correct ?    6 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / saumik mallick

BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)

Is This Answer Correct ?    6 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / yogesh babu

BILL Of Quantity

Is This Answer Correct ?    2 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / vincent koil raj

bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure

Is This Answer Correct ?    2 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / t.nagarajan

BOQ Is Bill Of Quantity.

Is This Answer Correct ?    1 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / qazi kamran yasin

bill of quantity.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

0 Answers   Rites,


best hand book for civil engineers with practical criteria

2 Answers  


How to calculate cement qty of M10, m20, m25 ? I got the formula but I lost it.

3 Answers  


what is the function of GSB all class ?

0 Answers  


What is the specific weight of sand?

14 Answers  






What is the ratio of M40 Concrete?

1 Answers  


WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?

3 Answers  


At which place Construction joint should provide in slab and Beam at the time of casting.

3 Answers  


how much steel required for 1 sq.m area?

24 Answers   AA Architects, L&T,


what is velocity of approach?

7 Answers  


what is the use of dowels rod..?

2 Answers  


how many types of survey and what are levelling instrument?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)