what is BOQ? BOQ IS US IN ESTIMATE
Answers were Sorted based on User's Feedback
Answer / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / dinesh.rk
YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / saumik mallick
BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / vincent koil raj
bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure
| Is This Answer Correct ? | 2 Yes | 0 No |
please tell me how to convert cubic feet to cubic meter
What is the roll of face bars in beams
why you are selecting the civil engineering
4 Answers gdcl, Sobha Developers,
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
For 100 cu.m of solid block masonry in CM 1:6, 8" thick. Calculate no of blocks required...? Actually I got it as 1250 no's.. But in my material it is 1100 no's.. U guys plszz check & tell me the answer......
How many cement sand ballast in cc 1:4:8 40mm
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
In which code or text book can i get the reinforcement detailing for slabs, beams, columns.
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
What is the least count of Theodalite survey?
how can u extent the final setting time of cement?
2 Answers Sobha Developers, TNPSC Tamil Nadu Public Service Commission,
1m3 of brick is equal to how many cft of brick
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)