Answer Posted / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
what is the difference between np2 and np3 concrete mix
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Gidc technical que paper
what is tension column?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
what is the effect of duration of earth quake on framed structures ?
rate analysis hiring of generator 62.5 KVA
how to calculate spacing rod in column
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
How much cement,sand,bricks and water needed for 1square metre brick work?
How does a traffic light signal work ?
load combinations how many types for staad design purpose?
What is Refuse Area In High Rise Building ?
how many spacers we need for 1 ton reinforcement? aprox.