Answer Posted / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
Define What is the difference between routing maintenance and major maintenance in school facilities?
what is cement wastage percentage in NHAI ROAD WORKS
How to fix toll charge for a particular vehicle at toll booths in a highway?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Why the statue of liberty is made of copper?
Explain what is 1/8 on the architect ruler denotes?
important question on stones
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
Describe the sections included in a typical bill of quantities
Which purpose we use deck anchor in bridges?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
List out some of the checking’s, done at the completion of construction?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Discuss some applications of modular elasticity?