Answer Posted / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
What things architect have to take care of before starting any project?
Explain soil analysis?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
What is the cost difference between site mix and ready mix concrete per cubic meter
how many digree of freedom in four bar chain
why the openings of sieves are square io size?
Define line type?
residential projects,structural.
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?