How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
No Answer is Posted For this Question
Be the First to Post Answer
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
How many mortar required for Brickwork of 1 Cu.m works??
Water absorption for stone and first class stone bricks?
In case of tunnels (Railway) what is the way of securing a wall beam?
Why we are not provide bar in the centre of the column and bar?
can any body tell me that we stdy different grades of concrete $ their strength . as we knot the strength of conrete that this grade or ratio of concrete has this much strength ? even that we go for labortory test what is reason behind that?
How many number of bricks required for 1 cum & how much mortar quantity require for 1 cum
22 Answers Assurance, Campus Interview, R Tech Developers, Ramdev Construction, Synergy,
what is meant by structural design?
where can i get the previous question papers for rrb section enginerr (civil)
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
Why we do soil classification?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)