Answer Posted / saumik mallick
BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
Explain what are the skills required to become an architect?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
What is an ice dam sock?
what is smart building materials?
How many litres of water used for curing of 1000sqft of slav
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Where is the worlds longest elevator and how long is it?
Define What is the origin of name Railway Sleepers?
Explain the mechanism of cavitations in pipes and drains?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available