Answer Posted / dinesh.rk
YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
how to calculate the steel in 500yard
can i get civil engineering test papers.......?????
What is the ideal size of the living room ranges from small to large size?
What is the Maximum %age of Steel in columns and beams ?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
how to caliculate required amount of cement and sand required for 1cu.m.
How much percentage of brick bats allowed in CD-75 bricks
what is the criteria for the finalisation of pavement thickness in road project?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What is the difference between Grade I, II and III of GSB?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?