Answer Posted / dinesh.rk
YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
indian standard split spoon sampler
For what building Built-on balconies are preferable? What are the advantages?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
how to identify np3 pipe and np4 pipe
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Define the various stages of the project planning process in construction.
what is diversion?
The largest size of paper used in plotter to print the drawing made by Autocad .
what is the difference between natural draught cooling tower and induced draught cooling tower
in design case of structural member best suitrable percentage of steel limit is what
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
How many litres of water used for curing of 1000sqft of slav
Define graphics window?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )