M10 (1:3:6) - 34 to 36 lit(Water),Cement - 226kgs
M15 (1:2:4) - 29 to 32 lit(Water),Cement - 313kgs
M20 (1:1½:3)- 26 to 30 lit(Water),Cement - 404kgs
M25 (1:1:2) - 21 to 27 lit(Water),Cement - 563kgs
| Is This Answer Correct ? | 473 Yes | 138 No |
Answer / krishna kishore rajana
M 5 (1:5:10) - 60 lit(Water)
M 7.5(1:4:8) - 45 lit(Water)
M 10 (1:3:6) - 34 lit(Water)
M 15 (1:2:4) - 32 lit(Water)
M 20 (1:1½:3)- 30 lit(Water)
M 25 (1:1:2) - 27 lit(Water)
| Is This Answer Correct ? | 293 Yes | 52 No |
Answer / piyush singh
plain concrete
m15 = 0.60 mild
m20 = 0.60 moderate
m25 = 0.40 extrme
RCC
m20 = 0.55
m25 = 0.50
m30 = 0.45
m35 = 0.45
m40 = 0.40
| Is This Answer Correct ? | 172 Yes | 28 No |
Answer / parveen kumar joshi lucknow
Water cement ratio are always same that is around 48% of the
weight of cement less cement less water high cement high
water in high grade cement slump ratio is increased by adding
plastisizer by replacing water to increase the workability of
concrete.
| Is This Answer Correct ? | 61 Yes | 19 No |
Answer / ketan kumar bhatt
DESIGN MIX:
M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
12.5 mm Jelly : 455 Kg/ M 3
River sand : 794 Kg/ M 3
Total water : 176 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M 3
M25 ( 1 : 2.28 : 3.27)
Cement : 340 Kg/ M 3
20 mm Jelly : 667 Kg/ M 3
12.5 mm Jelly : 445 Kg/ M 3
River sand : 775 Kg/ M 3
Total water : 185 Kg/ M 3
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M 3
Note: sand 775 + 2% moisture, Water185 -20.5 =
164 Liters,
Admixture = 0.5% is 100ml
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture
(170.80+15.20)
M35 ( 1 : 1.79 : 2.57)
Cement : 410 Kg/ M 3
20 mm Jelly : 632 Kg/ M 3
12.5 mm Jelly : 421 Kg/ M 3
River sand : 735 Kg/ M 3
Total water : 200 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2400 Kg/ M 3
Note: sand = 735 + 2%, Water = 200- 14.7 =
185.30,
Admixture = 0.7%
M40 ( 1 : 1.67 : 2.39)
Cement : 430 Kg/ M 3
20 mm Jelly : 618 Kg/ M 3
12.5 mm Jelly : 412 Kg/ M 3
River sand : 718 Kg/ M 3
Water Cement ratio : 0.43
Admixture : 0.7%
Note: Sand = 718 + Bulk age 1%
M45 ( 1 : 1.58 : 2.26)
Cement : 450 Kg/ M 3
20 mm Jelly : 626 Kg/ M 3
12.5 mm Jelly : 417 Kg/ M 3
River sand : 727 Kg/ M 3 + Bulk age 1%
Water Cement ratio : 0.43
Admixture : 0.7%
M50 ( 1 : 1.44 : 2.23)
Cement : 450 Kg/ M 3
20 mm Jelly : 590 Kg/ M 3
12.5 mm Jelly : 483 Kg/ M 3
River sand : 689 Kg/ M 3 + Bulk age 12%
Water Cement ratio : 0.36 (188 Kg)
Admixture : 1.20%3
Micro silica : 30 Kg
Super flow 6.7% of cement
| Is This Answer Correct ? | 47 Yes | 13 No |
More typical water-cement ratios of 0.4 to 0.6 are used.
The 1997 Uniform Building Code specifies a maximum 0.50
water-to-cement ratio (1:2).
| Is This Answer Correct ? | 36 Yes | 10 No |
Answer / ketan kumar bhatt
Water 0.45 for 1 : 1 : 2 concrete
Water 0.5 for 1 : 1.5 : 3 concrete
Water 0.5 to 0.6 for 1 : 2 : 4 concrete.
| Is This Answer Correct ? | 33 Yes | 9 No |
Answer / yogesh
Generally the water cencement ratio varies from 0.4 to 0.8 , It depends on grade of concrete as the grade of concrete increases w/c ratio bcome less.
W/c ratio is main cause of strengthening of concrete so if w/c ratio is less strength will be more and if w/c ratio is more strength will be less.
| Is This Answer Correct ? | 19 Yes | 3 No |
Answer / p.s.vijaya bhaskar
M10 concrete is very low grade so
Water-192/cum
Cement-150/cum
Flyash-150/cum
So water cement ratio-0.64 is ok after 28days 25mpa
U need more strength add cement content 20kg
Using the admixture is best way-1.5/cum
Because workabality
M20 grade
Water-185
Cement-160kg/cum
Flyash-150kg/cum
W/c-0.59
M30-grade
Cemnt-200kg/cum
Flyash-170kg/cum
Water-176
W/c-0.47
Thank u
| Is This Answer Correct ? | 10 Yes | 5 No |
Define What happens to Load at yielding ?
explain the rale of the government in the construction industry
How do you derive the quantity of cement & sand in brick work construction in 1Meter cube, using CM 1:6 and bricks of size 19*9*9 cm
In your experience what is the maximum beam length. What's beam size and also please provide column size also. Thanks.
What"s mean by term of BOQ in construction?
13 Answers Jaypee, Shaarc Projects, Xerox,
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Wat is meant by Aecron brick?
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
what is mean by tie beam?where it is used?
1 bundle=how many rods s there? and what is the length of each rod
If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?
Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? Regards,
45 Answers CDS, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)