Answer Posted / mahendra
BOQ is Bill of Quantity.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is Critical path in Ms-Project ?
Whats the meanig of ,'K' VALUE in the case of soil.....
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
all technical question
how to compute slab reinforcements on step by step procedures??
How to testing voids of filled aggregate in bitumen mix design
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Why we provide hair pin for shed
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
Explain the various stages of the project planning process in construction?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What are the main reasons for conducting pull-out tests for soil nails?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?