Answer Posted / vincent koil raj
bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Define a polyline?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
Tell me about triple point of water.
Water filter calculation formula
How to plan a project
Consumption of Binding wire for fixing of cover block in vertical surface
How to take labor charges for construction of 1cum of concrete?
what is mean by reestimation?
what is the breaking strength of wall tiles
sir how can we find the cement and sand required for making 4" drop
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
how to calculate the scour depth