Answer Posted / vincent koil raj
bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is min thickness,min grade of conc & age of PQC ?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how can we construct building without foundation providing only grade beam at ground level
Which are the top apps for you civil engineering?
what is the maximum number of course that can be laid according to IS code and the max height.
explain the advantages of total stasion
If specific gravity of cement is less than 3.15 what is the cause?
how much shouid be the rate for ready mix concrete per cubic meter
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
whats is difference between anchorage length and development length
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
How many mortar required for Brickwork of 1 Cu.m works??
Describe the various methods of concrete curing?
How to find CN by using arcgis 9.3?