Answer / senthil kumar p
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
| Is This Answer Correct ? | 115 Yes | 6 No |
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
| Is This Answer Correct ? | 79 Yes | 8 No |
Answer / ganesh mapari
7 Day for Brickwork and Plastering
14 Days for Concrete
| Is This Answer Correct ? | 36 Yes | 3 No |
Answer / udaya
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
| Is This Answer Correct ? | 24 Yes | 7 No |
Answer / ram mohan rai
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / engr.sameer
concrete need min 7 days contineous curing
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / muraliyadav
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
| Is This Answer Correct ? | 10 Yes | 12 No |
In two way slab where should we stop the work at end of the day?
URGENT: please tell me what's normal drawing scale for residential building and commercial building? Thanks.
Unit weight of sand
how to convert kg/m3 to kg/cft
Key is put at the time of casting 1st lift of column to get– –
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
what is workability,define it?
how many cement bags required for one cum of brick work the brick size is 20x10x10.
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
the size of one block is 390mm×190mm×190mm.then how much block will required for 4.6m × 3.4m wall.the thickness of wall is 190mm
What are the techniques to measure road difference?
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)