how many days we should curing for
plastering,brickwork,concrete?
Answers were Sorted based on User's Feedback
Answer / senthil kumar p
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
| Is This Answer Correct ? | 115 Yes | 6 No |
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
| Is This Answer Correct ? | 79 Yes | 8 No |
Answer / ganesh mapari
7 Day for Brickwork and Plastering
14 Days for Concrete
| Is This Answer Correct ? | 36 Yes | 3 No |
Answer / udaya
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
| Is This Answer Correct ? | 24 Yes | 7 No |
Answer / ram mohan rai
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / engr.sameer
concrete need min 7 days contineous curing
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / muraliyadav
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
| Is This Answer Correct ? | 10 Yes | 12 No |
in one SQM plaster how much Cement and sand consumed in ratio 1:4
what is the defination of an ideal fluid?
What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
Will going from a 3-tap to 6-tap increase water pressure?
How to calculate the crank rod in slab
0 Answers Bridge and Roof, Krishna Constructions,
what is the basic difference between a singly reinforce section & a doubly reinforce section?
is concealed wiring a problem in fly ash brick wall?
quantity of sand in cft in 1:6 cement sand mortar
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
is it correct method to use crush sand in concrete as per is code
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)