how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / engr.sameer
concrete need min 7 days contineous curing
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
How and where are aqueducts built?
How do you convert wind speed into force?
What is the density of DLC & PQC and how it is differ from normal concrete?
define the strength
What is meant by scaffolding coefficient?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
Material calculation of cm 1:6 for 1sqm
what is mean by reestimation?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?