how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / senthil kumar p
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
| Is This Answer Correct ? | 115 Yes | 6 No |
Post New Answer View All Answers
Process of pcc in wateredug
why we use aggregate,sand with cement in concrete?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
How can you achieve soil enforcement?
will fix foundation bolts at site with out template is there any procedure?
Define What are the uses of alloys in daily life and how are alloys made?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is Critical path in Ms-Project ?
what is civil all interview questions
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How to estabilish reinforcement Steel rolling margin for a building projects ?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
What are advancements in civil engineering?
Dear Sir What is the Contraction joint for base Slab