how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / udaya
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
| Is This Answer Correct ? | 24 Yes | 7 No |
Post New Answer View All Answers
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is the tensile strength of wood?
what mean By core Billing
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
What is hybrid foundation?
Sir how to find cutting length for footing steel bars in the shape of "u"
What is the exception critarea of cube?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is Bearing Capacity,How to determine it?
What is pre-stressed concrete?
Where will be the maximum bending moment in a TEE Beam?
List out some of the checking’s, done at the completion of construction?
which formula used for calculate the area of segmental arch?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
what is education Cess.