Answer Posted / ram mohan rai
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What things you need to take care of before building a kitchen island?
Define What is diversion tunnel in a dam?
What are the different types of civil engineering?
what is directivity effect?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Define current ucs?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
How to come 1.54 from dry to wet concrete?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Difference between lime, distemper and plastic emulsion?
How much cement,sand,bricks and water needed for 1square metre brick work?
what discoveries did you have in relation to your course?
what is column foundation