how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / jai.vignesh
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
| Is This Answer Correct ? | 79 Yes | 8 No |
Post New Answer View All Answers
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
How to determine spacing of bars in slabs or beams
why is the column design?
Technical Question of Civil Engineering
Explain what is Critical Path Method (C.P.M)?
I want to join bhel because
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
why are you joining in this (applied post) job and your aim for this job
How to decide/consider the grade of bitumen for dbm.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
how much used soil in 1 brick of standard size?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
what is m30 in concrete tiles