Answer / yogesh jadhav
m15(1:2:4)
100cum given
wet volume of concrete=30%more than dry volume
=1.3*100=130cum
wastage=20%of wet volume of concrete
=1.2*130=156cum
volume of cement required=156cum/1+2+4=22.28cum
1 bag of cement=35 lit=0.035cum
no of cement bags required=22.28/0.035=636.57=637bags
sand rqd=2*22.28=44.56cum
coarse agg reqd=4*22.28=89.12cum
Is This Answer Correct ? | 24 Yes | 5 No |
Answer / sjtbehera
For3 100 cum
Aggregated- 88 cum
Sand-44 cum
Cement- 22cum. 660 bag
Is This Answer Correct ? | 18 Yes | 7 No |
Answer / channa
1m3 of dry concrete = 1.54m3 of wet concrete
Concrete work to be done=100×1.54=154m3
Cement=(1/(1+2+4))×154=22m3
Wkt, density of cement=1440kg/m3
Mass of cement=1440×22=31680kg
No of cement bags= 31680/50=634bags of cement required
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vishamvar
For 10cum of M15 (1:2:4)
concrete 15.2cum dry weight
is require thus
for 100cum concrete
approx. Quantity of material
will be
Cement = 21.71 cum
Sand = 43.43 cum
Aggregate = 86.84 cum
Is This Answer Correct ? | 5 Yes | 3 No |
Answer / ajit kiling
For 100 cum work
For m15 grade of concrete (1:2:4)
Dry mortar of 1cum =1.54cum For 100cum= 100*1.54
= 154cum
Cement=154/(1+2+4) = 22cum
Sand= 22*2=44cum
Aggregate=22*4=88cum
Is This Answer Correct ? | 2 Yes | 0 No |
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Strength of brick?
What Are The Steps Involved In The Concreting Process, Explain?
what is the basic difference between Coloumn & Shear Wall
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
how much the volume of one packet cement ?
The definition of national highway
what is period of de-shuttering for different area of slab of M25 grade?
PERT Chart
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
What is the diff between cad & cadd?