how many days we should curing for
plastering,brickwork,concrete?
Answer Posted / venkataratnam.y
minimum 7days
| Is This Answer Correct ? | 21 Yes | 3 No |
Post New Answer View All Answers
Formula of mid span bar
What is a bearing capacity of soil?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What are the different approaches in designing the floors of the service reservoirs?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Material calculation of cm 1:6 for 1sqm
What are the applications of modulus of elasticity?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What is the difference between EPC,DBOOT and BOOT.
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
what is the list of building construction equipment & teir output?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
rimmer in pile foundation