Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

n.vigneshkumar


{ City } coimbatore
< Country > india
* Profession * engineer-civil
User No # 54317
Total Questions Posted # 0
Total Answers Posted # 4

Total Answers Posted for My Questions # 0
Total Views for My Questions # 0

Users Marked my Answers as Correct # 215
Users Marked my Answers as Wrong # 21
Questions / { n.vigneshkumar }
Questions Answers Category Views Company eMail




Answers / { n.vigneshkumar }

Question { 11917 }

what compressive strength of bricks?


Answer

first class bricks = Between 7 to 10 N/mm2
Second class bricks= Between 3 to 7 N/mm2
Third class bricks = Less than 3 N/mm2 (should not used)

Is This Answer Correct ?    9 Yes 2 No

Question { 10067 }

what is the stripping time of beam?


Answer

As per Indian Standards:
1. Vertical form work to Beams = 16 to 24 hours
2. Props to beams Spaning up to 6.00m = 14days
3. Props to beams Spaning up to 6.00m = 21days
4. Props to be refixed immediately after
removal of form work = 7days

Is This Answer Correct ?    11 Yes 2 No


Question { IOCL, 52394 }

What is the difference between load bearing and non load
bearing walls? How to distinguish both?


Answer

Load bearing walls:
It should transfer the load (live load,dead load) from
slab,beam,lintel etc,, to the foundation. This structure
designed for Loading condition.

Non Load bearing wall:
This wall won't take any load. It's just like a partition
between adjacent Space. this wall designed to take its self
weight alone

Is This Answer Correct ?    116 Yes 9 No

Question { CCCL, 72630 }

how many days we should curing for
plastering,brickwork,concrete?


Answer

Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound

Is This Answer Correct ?    79 Yes 8 No