how much quantity a carpenter do shuttering per day
Answers were Sorted based on User's Feedback
Answer / shawaiz khan
3 to 4 m2 per day should be done by carpenter with one helper
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / srimanta
Contractor carpenter can do 10sq mt slab&beam shuttering per day.
| Is This Answer Correct ? | 12 Yes | 15 No |
Answer / naveen
For slabs within normal height 15-25sqm
beams and columns 10-15sqm
| Is This Answer Correct ? | 22 Yes | 31 No |
In your experience what is the maximum beam length. What's beam size and also please provide column size also. Thanks.
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.
IS code for grade of concrete for bamboo lintel????
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
How many number of cement bags per running metre are required to cast pileof M-20 grade
Tell me about triple point of water.
what is curing?
Ehat slump test of column & retaing wall.
why cracks develop at the upper corners of doors openings
all engineering filed in which branch mother branch
22 Answers L&T, Manoj Pharma Ltd,
how many binding wire can be required for 1 metric tonne steel?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)