how much quantity a carpenter do shuttering per day
Answers were Sorted based on User's Feedback
Answer / shawaiz khan
3 to 4 m2 per day should be done by carpenter with one helper
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / srimanta
Contractor carpenter can do 10sq mt slab&beam shuttering per day.
| Is This Answer Correct ? | 12 Yes | 15 No |
Answer / naveen
For slabs within normal height 15-25sqm
beams and columns 10-15sqm
| Is This Answer Correct ? | 22 Yes | 31 No |
How to convert n/mm2 in to kg/cm2?
38 Answers Rvr Projects Pvt Ltd, Soma Enterprises, Unitech, Wipro,
what is the concrete grade for 1034.13N/mmsq
how to manage interview fear? and speak in english?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
when we calculate concrete volume in footing the column along with footing up to the ground level is also taken or not ?
How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
0 Answers L&T, Shoba Devlopers,
How to calculate soil bearing capacity of soil?
is their any instrument which can detect steel after casting of slab,etc. for verification of steel in slab,etc.
what is the water cement ratio for plastering
How much 1 cum of M15, M20 & M25 concrete weigh?
In pile foundation which kind of action are take place?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)