how much quantity a carpenter do shuttering per day
Answer Posted / m s khan
for slab = 8 to 10 beam=15,colmn=8to 10
| Is This Answer Correct ? | 15 Yes | 18 No |
Post New Answer View All Answers
Explain the mechanism of cavitations in pipes and drains?
how to calculate quantity of bricks in circular manhole with examples.
What is c.g.i sheet which used for roof??
how much of the strength comes from post-production curing
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Does brick grows bigger every year?
How to marking the building
Explain what are the phases inspections are done by local authority while construction?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
in plate load test what is the thickness of plate 20mm 5mm 50mm none
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What is the difference between shear and tensile strength?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the meaning of soil reinforcement?