how much quantity a carpenter do shuttering per day

Answer Posted / m s khan

for slab = 8 to 10 beam=15,colmn=8to 10

Is This Answer Correct ?    15 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

construction workers how much time take one work or qty

1133


At what point does a circle start losing area when being flattened?

640


How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?

1545


how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?

1190


how to calculate the concrete mix m30 by volume

1101






Are cruise ships built for the transatlantic run?

765


what is your role of in previous company as a construction manager

1574


What is the difference between absorption & adsorption and sorption?

755


What are the advantages of cad software’s?

688


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

1545


What are the RISKS during the project construction?

1743


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2637


Wat is meant by Aecron brick?

1657


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1239


what is flexible and rigid footing?

1858