how much quantity a carpenter do shuttering per day
Answer Posted / ranjith
Trapiesoidal formula.
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
Test procedure of fly ash bricks as per code ?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
at what pressure ply-wood is obtained by gluing wooden sheets
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What is the force exerted by the tacoma narrows bridge?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
what is flashing?
how to workable concrete cube test M-25 design mix
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is the effect of duration of earth quake on framed structures ?