Kindly tell me a book name to study for BIS exam
Answer / kal
I only asked this question. Pls reply soon. the exam is
nearing
| Is This Answer Correct ? | 6 Yes | 2 No |
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
why did you choose this career
why we need pcc?
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
16 Answers ARS, College School Exams Tests, Gulf Construction, HRL, mWorkspace, NCC, URC Construction,
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
what is the definition of stress& strain.
93 sqmtrs area how many sand and how many cement is requir in 1;5 ratio
What is mean by Engineers ?
how can u extent the final setting time of cement?
2 Answers Sobha Developers, TNPSC Tamil Nadu Public Service Commission,
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)