how much quantity a carpenter do shuttering per day
Answer Posted / muhammad shabeel
Carpenter productivity 2-3 per day
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
what is mc arther pile?
What are the disadvantages while using stone dust as filler in pavements?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Why are the bolts that hold steel rails together in oval holes?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
can i get hindi version of is codes based on civil engineering?
What are the materials used in building a gravity dam?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is meant by a context menu in a cad software?
What are the different types of civil engineering?
Which stone is best for wall construction Laterite Stone or Cement Blocks