how much quantity a carpenter do shuttering per day

Answer Posted / shawaiz khan

3 to 4 m2 per day should be done by carpenter with one helper

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the types of dimensioning?

1741


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1885


What is the compressive strength of fly ash bricks?

699


what does the grad of cement shows (denotes)?

1153


how to preaper for interview wat they asked in interview give me idea

2182






Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1730


what is the criteria for the finalisation of pavement thickness in road project?

1597


what is called Bulk Density of aggregate?

1445


pile load testing procedure

1755


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1952


The 4 main factors to start a construction project are––

1796


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

955


In case if concrete box girder bridges how is the number of cells determined?

717


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1626


Please tell me vasthu room sizes. Thanks.

1770