how much quantity a carpenter do shuttering per day
Answer Posted / shawaiz khan
3 to 4 m2 per day should be done by carpenter with one helper
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
How will you reduce the concrete flow after mixing the concrete
What you understand by richter scale?
What is the difference between a wood shake and wood shingles?
what is the exact dia of 8swg and 10swg gabion wire
How much cement and sand required for 9"brick wall per square metre
how much required strength of cement concrete bricks(size 230x115x75mm)
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
what is the design procedure for building
What is soil enforcement?
What is a projection line?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
what is labour consume factor in residential projects
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .