how much quantity a carpenter do shuttering per day
Answer Posted / shawaiz khan
3 to 4 m2 per day should be done by carpenter with one helper
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what are the types of dimensioning?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is the compressive strength of fly ash bricks?
what does the grad of cement shows (denotes)?
how to preaper for interview wat they asked in interview give me idea
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
what is the criteria for the finalisation of pavement thickness in road project?
what is called Bulk Density of aggregate?
pile load testing procedure
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
The 4 main factors to start a construction project are––
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
In case if concrete box girder bridges how is the number of cells determined?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Please tell me vasthu room sizes. Thanks.