Answer / sachin
a carpenter can do 3 to 4 sq m shuttering per day
| Is This Answer Correct ? | 256 Yes | 57 No |
Answer / nitin adate
Actually Shuttering output is depend upon type of
structure,height of structure, slab to slab height,shape of
structure, type of shuttering & most important availability
of skilled labour.But for planning purpose 2.5 to 3.00
sqmt /per day ( 1Skilled Carpenter + 2 helper ) is
reasonable value.
| Is This Answer Correct ? | 106 Yes | 31 No |
Answer / aijaz hussain, modi builders
The Out-turn of a Shuttering carpenter per day is between
2.5 sq.m. to 3 sq.m.
| Is This Answer Correct ? | 64 Yes | 27 No |
Answer / m md ali
Formwork-Footings, foundations, ground- Sqm 8
Formwork-Columns, pedestals- Sqm 6
Formwork-Beams and slabs -Sqm 8
Formwork-Tie beams, arches, lintels.
Formwork-Walls- Sqm 12
Formwork-Circular, special shapes -Sqm 4
Formwork- Making timber shutters -Sqm 8
| Is This Answer Correct ? | 31 Yes | 3 No |
Answer / uday gandhi
1CARPENTER + 2 HELPER SHALL GIVE OUTPUT OF 11 SQUARE METERS IN 08 HOURS OF WORK.
| Is This Answer Correct ? | 92 Yes | 67 No |
How many steel is require in one cubic meter area?
What is kn measurement?
What is the primary difference between adsorption and absorption?
what is the service corridor?
How to calculate the dia of reinforcement when required (as per drawing) dia of reinforcement steel not available at site?
3 Answers MNC, N J Devani Builders, Simplex,
Define What are the reasons for geotechnical site investigations in Uganda?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
why does only water ads in concrete?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
What is the 162 in steel weight formula?
What is missing report and how to prepare
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)