Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Cost control in civil construction as well as Quality control

Answers were Sorted based on User's Feedback



Cost control in civil construction as well as Quality control..

Answer / s c jayakumar

To control cost in construction proper utilisation of
resorces in time,to avoid wastage of resources,Proper
planning and Safety and Quality awarness of workmen as well
as staff.

Is This Answer Correct ?    12 Yes 0 No

Cost control in civil construction as well as Quality control..

Answer / ganesh purkar

FOR CONCRETE WORK GO FOR MIX DESIGN WITH MINIMUM CEMENT
CONTENT REQUIRED ,PROPER PLANNING NOT ONLY FOR EXECUTION
BUT ALSO FOR MATERIAL SUPPLY PART,PLAN THE BILLING
CYCLE,SEE THE WASTEAGE CALCULATION FOR ALL CIVIL
MATERIAL,PAY ATTENTION FROM BOTTOM LEVEL OF EXECUTION
TEAM,MAXIMUM UTILIZATION OF RESOUCES AVAILABLE WITH
YOU,LAST NOT THE LEAST PLAN FOR THE EMERGENCY SITUATIONS
ALSO.

Is This Answer Correct ?    14 Yes 4 No

Cost control in civil construction as well as Quality control..

Answer / samiul haque syed

QUALITY DEPEND ON GROTH OF PRODUCTIVITY WHICH IS THE EASEST.
WAY ADMIRE THE LOYALTY OF BENIFIT BY THE GROWING MULTY
NATIONAL COMPANY.

Is This Answer Correct ?    5 Yes 1 No

Cost control in civil construction as well as Quality control..

Answer / d. karthick

Safety First, Quality Best, Progress Must. If we follow the
above wards, we can able to complete the Project on Time.
During the Project we can not control the cost of concrete,
steel and other Project material (Only thing we can control
the wastage). But we can control the Overhead Cost for P&M,
Staff salary and other temp. works by completing the
project before the dead line

Is This Answer Correct ?    4 Yes 1 No

Cost control in civil construction as well as Quality control..

Answer / vijender kumar

It is depend on the market conditions. what is the
customers needs & requirments. most of the people want to
utilize the resources at a minimum cost.behalf of the
organisation it is very importent to cost control with
average quality.this treatment will increase company's
profit at higher level.
On the other hand quality control is also very
determine.consumer is not blind, he demands for good
quality product which is purchasing by him, & he could pay
little more for it.
so atlast, customer can compromise with cost somewhere but
he can not that much compromise with the quality.

Is This Answer Correct ?    4 Yes 2 No

Cost control in civil construction as well as Quality control..

Answer / navin morwal

Yes, this is true. Because if one is less than second are
automatic decrease.

Is This Answer Correct ?    2 Yes 1 No

Cost control in civil construction as well as Quality control..

Answer / dushyant bansal

If one can provide a control on Quality, Cost and Time all
at a time then the cost can be perfectly optimised.

For the above said minimum wastage and timely completion of
work must be assured.

This can help in cost control as it can help us reduce
inventory cost.

Also labour time wastage can be reduced if all work is done
with a planned schedule. whichin turn affects the cost.

Lean production is the best method i consider to optimise
the cost.

Is This Answer Correct ?    1 Yes 0 No

Cost control in civil construction as well as Quality control..

Answer / ravindran

provide flyash or GGBS in concrete to replace for cement
if specified in Technical specification,avoid maximum
watage of concrete and other materials,utlize correct
manpower, using minimum cement content in concrete,proper
planning,Sheattering materials should properly stored and
used for more than 8 repetition

Is This Answer Correct ?    2 Yes 2 No

Cost control in civil construction as well as Quality control..

Answer / aijaz hussain, modi builders

Following Factors are required to be keenly observed for
cost control in civil engineering:
1) Proper usage of resources in time
2) Proper Planning and safety
3) Avoid wastage of resources
4) Quality awareness in workmen and supervision/ execution.
5) Usage of good quality material
6) Usage of skilled workmen thus controls corrections.

Is This Answer Correct ?    1 Yes 1 No

Cost control in civil construction as well as Quality control..

Answer / aglawe chandrakant vasantrao

For cost contol in civil construction is most improtent
as well as quality control. In mix disign the strength of
the concret is improved by concret sefty factor,in mix
disign proper mixing & proper supervision.

Is This Answer Correct ?    5 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.

1 Answers  


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

0 Answers  


Which apparatus done steel (bar) tension test

1 Answers   Kesri Construction,


What is the Maximum & Minimum size of rod using on the column?

5 Answers  


What is the roll of face bars in beams

2 Answers  


How to calculate the quantity of brick or mortar in m3. like in 1m3 brick =....no. .......mortar=....m3

1 Answers   A2Z Infrastructure,


Which one is the main bar in a square slab (2m x 2m)

7 Answers  


what is spt

2 Answers   L&T,


why we use minimum cement as given in IS mix design code

5 Answers   BARC,


How many kilograms of 12 mm coarse aggregate required in cufic feet for one cubic meter of M25 grade concrete

1 Answers  


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

0 Answers  


why only water cement ratio always......why not water sand ratio while making concrete

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)