Cost control in civil construction as well as Quality control
Answer Posted / samiul haque syed
QUALITY DEPEND ON GROTH OF PRODUCTIVITY WHICH IS THE EASEST.
WAY ADMIRE THE LOYALTY OF BENIFIT BY THE GROWING MULTY
NATIONAL COMPANY.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
How many axes do cartesian coordinate system has?
why we are useing plastic under the lean concrete?and whts the advantage?
please send me bhel questions on rupesh.017@rediffmail.com
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
i want texture painting pwd data
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What is the density of most of construction materials?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
how to prepare site mix design
How to calculate quanty of steel in four leg stirrups?
Where will be the maximum bending moment in a TEE Beam?
How can you produce desired alloys and discuss their applications in daily life.
Name the main components of a cad gui?