Cost control in civil construction as well as Quality control
Answer Posted / dushyant bansal
If one can provide a control on Quality, Cost and Time all
at a time then the cost can be perfectly optimised.
For the above said minimum wastage and timely completion of
work must be assured.
This can help in cost control as it can help us reduce
inventory cost.
Also labour time wastage can be reduced if all work is done
with a planned schedule. whichin turn affects the cost.
Lean production is the best method i consider to optimise
the cost.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
What is meant by a context menu in a cad software?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
what is concrete canvas?
how to calculate the concrete mix m30 by volume
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
I want to join bhel because
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Can we use the flyash bricks in brick bat coba?
plumbing CPVC fitting FTE Brass full form
What is different between DI Pipe and CI pipe?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
Why are separation membranes used between concrete pavement slab and sub-base?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.