Cost control in civil construction as well as Quality control
Answers were Sorted based on User's Feedback
Answer / mahendra mohan srivastava
In Civil engineering we can cost contral by save time. if
we have done our work with in time.
| Is This Answer Correct ? | 3 Yes | 8 No |
how to calculate cut length of for a triangular portion for steel ?
What isthe formula for square
1 Answers Panchayati Raj Department,
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
is robosand to be use construction ? for slab ?, wall construction and plastering ?,is it give life?,which is best robosand or river sand ?
what is shear force
2 Answers NLC Neyveli Lignite Corporation Limited,
how do we design mix ratio?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
how to the steel dia without using d2/162
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
what is singly & doubly rc beam? what is difference between them?
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
What are the tests on concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)