Cost control in civil construction as well as Quality control
Answer Posted / ganesh purkar
FOR CONCRETE WORK GO FOR MIX DESIGN WITH MINIMUM CEMENT
CONTENT REQUIRED ,PROPER PLANNING NOT ONLY FOR EXECUTION
BUT ALSO FOR MATERIAL SUPPLY PART,PLAN THE BILLING
CYCLE,SEE THE WASTEAGE CALCULATION FOR ALL CIVIL
MATERIAL,PAY ATTENTION FROM BOTTOM LEVEL OF EXECUTION
TEAM,MAXIMUM UTILIZATION OF RESOUCES AVAILABLE WITH
YOU,LAST NOT THE LEAST PLAN FOR THE EMERGENCY SITUATIONS
ALSO.
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is the diameter of the 3"inch nails?
what are the ffactors you considered choosing the course?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
what are the Task work of different labour.?
though u r a civil engineer, y r u interested in tcs???
How to find out slope footing concrete
sir please send me campus placement questions in civil engineering
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How to decide/consider the grade of bitumen for dbm.
what is m30 in concrete tiles
what is kribs is supporting?
how much need sand and cement for 1 cft roof construction?