Cost control in civil construction as well as Quality control
Answer Posted / d. karthick
Safety First, Quality Best, Progress Must. If we follow the
above wards, we can able to complete the Project on Time.
During the Project we can not control the cost of concrete,
steel and other Project material (Only thing we can control
the wastage). But we can control the Overhead Cost for P&M,
Staff salary and other temp. works by completing the
project before the dead line
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Mention what are the composition of a landfill?
how to calculate quantity of bricks in circular manhole with examples.
Why joints are provided?
what is the max. area can we apply the plate load test ?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
For what building Built-on balconies are preferable? What are the advantages?
What are the advantages of building a dam on the river nile?
how many cement used in single story residential building per sqft
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What are segregation and bleeding?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
What is packing Factor ?
what is labour consume factor in residential projects
what is the use in canals of longitudinal drains and cross drains in lining areas?
types of survey and levelling instrument ?