if we get water mor from 28 days to the rcc concret is this better or have a damag
Answers were Sorted based on User's Feedback
Answer / santosh
as we know after 28 days concrete attains 90% of its strength
and concrete takes years to attain 100% of its strength so there is no point curing more.it is wastage of water
| Is This Answer Correct ? | 15 Yes | 0 No |
specifications of fe500 steel
calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum
What is the Null Point of chimney in Power Plant
why moment is create in fixed beam. And why moment is not create in simply support beam
How can you produce desired alloys and discuss their applications in daily life.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
I dont know english very well to speak,in interview if they ask to introduce yourself means how to answer in english?
what is the difference between factor of safety and partial safety factor.??
for 100 sqm cement concret (1:2:4) 4cm thick floor,the quantity of cement required is
hai.... please any guide me were i can get interview questions& ans for Unigraphics
which is greater moment at centre or fixed end moment for a fixed beam with udl
why we used bricks in brickbat coba? main roll of bricks ? how it function?
3 Answers Brigade, Waskom Construction,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)