How many kilograms of sand required in cufic feet for one
cubic meter of M25 grade concrete

Answers were Sorted based on User's Feedback



How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / himanshu

10.1706048 sq feet need in one meter qube

Is This Answer Correct ?    5 Yes 2 No

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / ankem naga venkata manikantha

sand weight varies due to different grades and it depends upon its specifi gravity and its normally ranges from 1450 to 2082 kg/m3

Is This Answer Correct ?    2 Yes 0 No

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / devineni srinivasa rao

sand for 1 cumt concrete 0.48cu mt
s.g of sand 2200kg/cu
sand .48x2200 -

Is This Answer Correct ?    0 Yes 1 No

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete ..

Answer / vijay patel

937.5kg sand per m3of m25

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

How do you calculate the mix ratio of concrete i.e. what is the cement:sand:agrugate ratio in 20Mpa, 21Mpa, 22Mpa etc...

2 Answers  


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

0 Answers  


How much sand for a 107sqm residensial building

1 Answers   Shapoorji Pallonji Group(SPCL),


how to find the quantity of materials required for constructing a wall of length 10*5*.2m?

1 Answers   ABC, L&T, NCC,


how to laying tarfelt on asbestos roof for leeks water?

1 Answers   NSL,






The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

0 Answers  


silt maximum in sand.

11 Answers   DLF,


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

0 Answers  


Rust in Rod is harmful in structure because -––

1 Answers  


How to calculate the quantity of ingredients of M20 grade concrete?

0 Answers  


6mm dia rod legth 1feet

5 Answers  


Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

0 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)