Cost control in civil construction as well as Quality control
Answer Posted / ravindran
provide flyash or GGBS in concrete to replace for cement
if specified in Technical specification,avoid maximum
watage of concrete and other materials,utlize correct
manpower, using minimum cement content in concrete,proper
planning,Sheattering materials should properly stored and
used for more than 8 repetition
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Stringer How many cm goes to landind
calculate the quantity of water for 1:6 cement mortar
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
how i get all type of short type question answer about civil engg
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the ideal size of the living room ranges from small to large size?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
about higyway engineering
How do you maintain water pressure?
Explain the various stages of the project planning process in construction?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Which is the best book for building construction?
types of piles detail,
What is geopolymer based concrete?